Solar panels & building work · UK · 2026

Solar panels and building work: lofts, extensions and new roofs

If the roof is coming off, the scaffolding is going up or the walls are open for rewiring, that is the cheapest moment to plan for solar panels. Here is what the planning and building rules say, what to agree with your builder, and what changed in 2026.

Verified · 10 Oct 2026legislation.gov.uk, Planning Portal, GOV.UK & Energy Saving Trust.
Solar panels and building work: fitting panels during a loft conversion, extension or new roof
What changed this year

In the news

In January 2026 the government published its £15bn Warm Homes Plan (BBC News), with grants and low- and zero-interest loans for solar panels, batteries and heat pumps in existing homes — the full plan is on GOV.UK.

In March 2026 it confirmed the Future Homes Standard (BBC News): from 24 March 2027, with a 12-month transition, new homes in England must generate renewable electricity on site and use low-carbon heating. The legal detail is in Building Circular 01/2026 and the minister’s written statement to Parliament.

The new-build rule does not reach extensions or refurbishments. But it is a clear sign of where the Building Regulations are heading, and a good reason to leave room for panels when you build now.

Scaffolding, structure and cable routes

Why building work is the moment

The Energy Saving Trust notes that installation costs less if scaffolding is already up for roof repairs, and that renewing the roof covering is sometimes recommended before panels go on so the roof stays watertight for the life of the system.

A loft conversion or rear extension also redesigns the roof structure. The Planning Portal says the roof’s ability to carry the weight of panels has to be checked and proven, and that some strengthening may be needed — far easier to allow for on the drawing than to add afterwards.

Then there is the wiring. Panels need a cable route down to an inverter and the consumer unit, and a battery needs a suitable spot with access for maintenance. Running those routes at first fix, before the plaster goes on, costs a fraction of chasing them into finished walls later.

Agree these before the roof is designed

What to plan with your builder

  • The roof area you will keep clear. Dormers, rooflights and soil vent pipes all eat into the unbroken slope panels need, ideally facing south, east or west.
  • The structure. Ask for the panel load to be included when the roof and any steels are designed.
  • The cable route and inverter position. A clear run from the roof to where the inverter and consumer unit will sit, decided at first fix.
  • Space for a battery. Often a loft, utility room or garage wall, with access for maintenance.
  • Scaffolding. If you are fitting panels at the same time, line the solar installer up to use the builder’s scaffold.
  • The roof covering. If it is near the end of its life, renew it before panels go on.

Your builder handles the structure and the openings; an MCS-certified installer designs and fits the solar system itself. Getting the two talking before the drawings are fixed is most of the battle.

Permitted development, conservation areas, listed buildings

Do you need planning permission?

For a house in England, roof-mounted solar panels are normally permitted development. The conditions are set out in Part 14, Class A of the General Permitted Development Order:

  • panels on a pitched roof must not protrude more than 0.2 metres beyond the roof slope;
  • they must not be higher than the highest part of the roof;
  • they should be sited, so far as practicable, to minimise their effect on the external appearance of the building, and removed when no longer needed;
  • listed buildings are excluded, and in conservation areas panels cannot go on a wall that fronts a highway.

Councils can also remove permitted development rights with an Article 4 direction. In Lewisham, for example, alterations to the roof of a house covered by a direction need planning permission. If you are in a conservation area, check with the council before you commission anything.

Loans, grants and VAT in 2026

Help with the cost

The Warm Homes Plan brings government-backed low- and zero-interest loans for solar panels, batteries and heat pumps, and fully funded packages for low-income households. Under the Warm Homes Loan Scheme rules, financed panels must be MCS-certified products fitted by an MCS-certified installer, and scaffolding for the solar installation counts as part of the eligible cost.

Installing solar panels in a home is currently zero-rated for VAT until 31 March 2027. To see what a system would save you, run your numbers through our solar panel savings calculator.

Official sourceslegislation.gov.uk — GPDO Part 14, Class A (solar on homes)Planning Portal — solar panels: Building RegulationsEnergy Saving Trust — solar panelsGOV.UK — Warm Homes PlanGOV.UK — VAT on energy-saving materials (Notice 708/6)

Frequently asked questions

Usually not, for a house in England: roof-mounted panels are normally permitted development. The panels must not stick out more than 0.2 metres beyond the roof slope or rise above the highest part of the roof, and should be sited to minimise their effect on the look of the building. Listed buildings are excluded, and in conservation areas there are extra limits — and a council Article 4 direction can remove the rights altogether, so check with your council first.

The Planning Portal says Building Regulations will normally apply to roof-mounted panels. The roof has to be shown to carry the extra load, and some strengthening may be needed; the electrical work is covered too. If you are already converting the loft or re-roofing, the structure is being designed anyway, which is the cheapest moment to allow for panels.

It can be. The Energy Saving Trust notes that installation costs less if scaffolding is already up for roof work, and that renewing the roof covering is sometimes recommended before panels go on. Planning the cable route and battery location during the build also avoids opening up finished walls later.

No. The Future Homes Standard amends the Building Regulations from 24 March 2027 (with a 12-month transition) so that new homes in England must generate renewable electricity on site, in most cases with rooftop solar, and use low-carbon heating. It applies to new dwellings, not to extensions or refurbishments of existing homes.

Under the Warm Homes Plan, homeowners can apply for government-backed low- and zero-interest loans for solar panels, batteries and heat pumps, and low-income households may get fully funded upgrades. To be financed by the Warm Homes Loan Scheme, panels must be MCS-certified products fitted by an MCS-certified installer. Domestic solar installation is currently zero-rated for VAT until 31 March 2027.

Work out the numbers

PVSolar panel savings calculatorYearly saving & paybackEPCEPC monthly costWhat your rating costskWhElectricity calculatorElectricity by usage£Cost of running a houseEvery bill, by propertyWHDWarm Home DiscountCheck eligibility⚡Gas & electric calculatorDual-fuel combined